    As Posted by SamwiseGamgee

    The Metro Iloilo Circumferential Road 1 (C1) is a 14.18-kilometer road project (mostly greenfield), within a 5 to 7-kilometer radius from the center of the city at the Arroyo Fountain.

    It starts from its northern terminus at the junction of the Iloilo-Dumangas Coastal Road in Balabago, Jaro District near the south bank of the Jaro Floodway, and follows a general direction of westwards along the floodway's south bank towards Buhang, Jaro (where it crosses MacArthur Drive or the Iloilo-Capiz Road), Tacas, Jaro and Ungka, Pavia (where it crosses the Tomas Confessor Highway to Sta. Barbara and the Iloilo International Airport), and then southwards to the Mandurriao District-Pavia-San Miguel tri-border (where it crosses the Iloilo-San Miguel-Leon-San Remegio,Antique Road), and on to Abilay, Oton then back again to Mandurriao, and ends at the Iloilo-Antique Road near the center of Arevalo District.

    The highway, with an initial right-of-way (ROW) of 40 meters is designed to have a minimum of two lanes of PCCP, both ways. Some sections are divided, some are not, but the undivided sections have an extra lane dedicated to bikers.

    The Metro Iloilo C1 crosses the Salog (Jaro) River, the Iloilo River and other smaller tributaries, thereby requiring the construction of at least four bridges.

    Construction is on going, with three (shorter) sections (Sections C, D and E) out of five - from the Coastal Road to Tomas Confessor Highway - already at the completion stage.



    NB: Text mine. Photos by Innovate Property and Investments Letters on the map do not indicate the road sections as constructed.
    ILOILO.... the rising sleeping dragon
    Moving in its own pace and at its own time

  • #2



    As posted by METROPOLITAN_ILOILO
    P2-B C1 city road project underway
    By: Lydia C. Pendon



    THE Department of Public Works and Highways regional office here has started the 14-kilometer Iloilo City Circumferential Road (C1) project worth almost P2 billion with the recent release of P4 million for the parcellary plan and acquisition of the road-right-of-way and determination of affected families.

    Iloilo City District Engineering Office OIC-District Engineer Jose Al V. Fruto said the C1 project is under the priority projects of President Benigno Simeon Aquino III.

    The circumferential road will have two lanes including road easement amounting to approximately P1.9 billion, thus about 30-meter wide of road-right-of-way should be acquired for the project and will be undertaken for about three to four years, Fruto said.

    The district engineering office will implement the first five phases of construction. It will also start the development of the 2.94-kilometer road network from the junction of Brgy. Buhang to Brgy. Tacas, both in Jaro District.

    The road project is expected to address the demand of the growing road traffic in Metro Iloilo area, in line with the vision of the metropolis as the socio-economic and tourism hub of Western Visayas.

    It will cover 8.28 kilometers in Iloilo City, 2.70 kilometers in Pavia and 3.20 kilometers in Oton.

    The plan interconnects the major radial roads leading towards Iloilo City, thus creating traffic congestion in the metropolis. This will reduce traffic congestion in the city by removing unnecessary traffic to pass through the busy districts, thereby enhancing the efficiency of the transport system.

    Source : http://www.thedailyguardian.net/inde...oject-underway

    ^^

    It will be 4 lanes all the way! :cheers1:
    Last edited by wapogwapo; 07-31-2014, 01:48 PM.
    ILOILO.... the rising sleeping dragon
    Moving in its own pace and at its own time

    Comment


    • #3
      As Posted by SamwiseGamgee

      Eastern terminus of C1 at Balabago, Jaro District.

      [/QUOTE]
      ILOILO.... the rising sleeping dragon
      Moving in its own pace and at its own time

      Comment


      • #4
        As Posted by SamwiseGamgee
        C1 crosses MacArthur Drive.

        ILOILO.... the rising sleeping dragon
        Moving in its own pace and at its own time

        Comment


        • #5
          As Posted by SamwiseGamgee
          C1 crosses the Tomas Confessor Highway from the Iloilo International Airport.

          ILOILO.... the rising sleeping dragon
          Moving in its own pace and at its own time

          Comment


          • #6
            Circumferential Road - Radial By Pass Road Intersection



            image hosted on flickr


            image hosted on flickr

            ILOILO.... the rising sleeping dragon
            Moving in its own pace and at its own time

            Comment


            • #7
              Circumferential Road - Hibao-an Mandurriao Section

              ILOILO.... the rising sleeping dragon
              Moving in its own pace and at its own time

              Comment


              • #8
                Circumferential Road - Hibao-an Mandurriao Section



                Last edited by wapogwapo; 07-31-2014, 02:17 PM.
                ILOILO.... the rising sleeping dragon
                Moving in its own pace and at its own time

                Comment


                • #9
                  Circumferential Road 1 - Centro Verde Section

                  ILOILO.... the rising sleeping dragon
                  Moving in its own pace and at its own time

                  Comment


                  • #10
                    Tree planting of 3,500 sapplings of Golden shower along the Cory Aquino Avenue. After a year it is expected that the trees shall have its first bloom of yellow flowers.




                    ILOILO.... the rising sleeping dragon
                    Moving in its own pace and at its own time

                    Comment


                    • #11
                      mga 1-2years nami na ini siya tulukon :bananadance::bananadance:

                      Originally posted by wapogwapo View Post
                      Tree planting of 3,500 sapplings of Golden shower along the Cory Aquino Avenue. After a year it is expected that the trees shall have its first bloom of yellow flowers.



                      Comment


                      • #12
                        From the Main Thread
                        Originally posted by batusay View Post
                        DENR launches new greening program in Iloilo City

                        Department of Environment and Natural Resources Secretary Ramon Paje launched on Thursday a new urban greening program along two new major highways in this city to be planted with Golden Shower and Fire trees.
                        The DENR chief was accompanied by Senate President Franklin M. Drilon and city mayor Jed Patrick Mabilog in launching the new program by planting trees along the road at Centro Verde in Mandurriao district.

                        Drilon lauded the DENR initiative in regreening both sides of the city’s 14 kilometer President Corazon A. Aquino new highway known as the circumferential road and after four years, will show off yellow flowers for a Golden Shower Festival. DENR will provide an initial 3,000 seedlings to be planted along the circumferential road.

                        Drilon also said the DENR will also provide the planting materials of Fire Trees to be planted along the 14 kilometer diversion road up to the Iloilo Airport entrance in Cabatuan, Iloilo. The road is officially known as the Senator Benigno Aquino, Jr. Avenue and the Golden Showers will encircle the Fire Trees.


                        :bananadance::bananadance::bananadance:
                        ILOILO.... the rising sleeping dragon
                        Moving in its own pace and at its own time

                        Comment


                        • #13
                          Hello there, I believe your blog might be having internet browser compatibility problems. Whenever I take a look at your web site in Safari, it looks fine but when opening in IE, it has some overlapping issues. I just wanted to provide you with a quick heads up! Other than that, great site!
                          Play Ludo King Game vs computer or friends on internet

                          Comment


                          • #14
                            The pooches preparing instruments gladly advance security canine preparing contributions. This limit can be educated to the littlest or the most essential mutts of any breed excepting developing. An unsafe flighty pooch in the home, nonetheless, a safe solid defender. Excessively numerous mutts strolling shoes give this transporter aside from a full information of the impacts of the use of erroneous or in-others conscious instruction techniques.

                            Click the link below which is given below for more info about protection dog training.

                            http://dogstrainingtools.com/product/protection-dog-training/

                            Comment


                            • #15
                              Through this post, I know that your good knowledge in playing with all the pieces was very helpful. I notify that this is the first place where I find issues I've been searching for. You have a clever yet attractive way of writing. backlinks

                              Comment